Leadership Vision

X-ELIO anticipates the future, is visionary and capable of defining what is yet to come. The world is set to consume more and more energy in the future, and it needs to increasingly rely on clean energy. X-ELIO will be there. Our ambition is to be a global industry leader with a consummate financial performance as well as a sustainable, renewable energies provider, dedicated to helping to cut greenhouse gases and fight climate change.: We are leaders in service, striving towards continuous improvement and implementing technological innovation in all our projects.

 



		
FACILITIES
DEVELOPED
PROJECTED
EXPERIENCE

HONDURAS · PV MARCOVIA

· Power: 42 MW nominal

· Total area used: 252 Ha

· Modules: 136720

· Avoided emissions: >43,000 tons of CO2. Equaling the annual electric consumption of 45,000 homes.

· Approximate production: 93,000 MWh/year.

PV Marcovia Project

KUWAIT · PV KUWAIT

· Power: 10 MW nominal

· Total area used: 37.60 Ha

· Modules: 32,452 modules

· Avoided emissions: >9,100 tons of CO2. Equaling the annual electric consumption of 868 homes.

· Approximate production: 17,600 MWh/year.

PV Kuwait Project

JAPAN · PV FUKURODA

· Power: 26 MW nominal (31.45 MW peak)

· Total area used: 54,0807 M2

· Modules: 126408 modules YINGLI YL 250P-29b

· Power Conditioner system: 26 ABB PVS800 inverters (1 MW)

· Approximate production: 33.337MWh/year.

PV Fukuroda Project

JAPAN · PV IWATE

· Power: 20 MW nominal (24.785 MW peak)

· Total area used: 50,99 Ha

· Modules: 81263 modules YINGLI YL 305P-35b

· Power Conditioner system: 31 HITACHI inverters (8×660 KW and 23X540 KW)

· Approximate production: 27,837 MWh/year.

PV Iwate Project

CHILE · PV URIBE

· Power: 50 MW (56,632,400 PV peak).

· Modules: 182,960 solar modules of 315 PV.

· Approximate production: 120,000,000 kwh/year.

· Jobs created (construction phase): 700 jobs during the 12 months of construction.

· Jobs created (operation phase): 60 jobs for maintenance tasks.

PV Uribe Project

JAPAN · PV HAYATO

· Power: 13.3 MW nominal

· Total area used: 43 Ha

· Modules: 52300

· Power Conditioner system: 16 SMA inverters (10×880 KVA y 6×750 KVA)

 

PV Hayato Project

JAPAN · PV ATAMI

· Power: 12 MW nominal (14.1316 MW peak)

· Total area used: 16.52 Ha

· Modules: 51,120 modules YL280P-29b

· Power Conditioner system: 31 ABB PVS800-57-1000KW-C

· Transmission Line: 4184m at 22 KV

· Main Transformer: 22kV/66kV 12.000kVA

PV Atami Project

Energy cannot be created or destroyed
it can only be changed from one form to another

Albert Einstein

JAPAN · PV S13

· Power: 32 MW nominal

· Total area used: 50.99 Ha

· Modules: 136720 YINGLI YL 265p-29b

· Power Conditioner system: 33 ABB1MW, 901 KW 100 KW

 

PV S13 Project

JAPAN · PV SHIROISHI

· Power: 22 MW nominal (27,889 MW peak)

· Total area used: 37.60 Ha

· Modules: 87.156 modules YINGLI YL 320P-35b

· Power Conditioner system: 34 Nissin Electric 660KW

· Substation: 22KV/66KV. 24 MVA Main transformer

PV Shiroishi Project

JAPAN · PV TSURUSU

· Power: 36 MW nominal (38,0016 MW peak)

· Total area used: 43 ha

· Modules: 116.928 modules YINGLI YL 325P-35b

· Power Conditioner system: 56 Nissin Electric 660KW

· Substation: 22KV/66KV. 36 MVA Main transformer

PV Tsurusu Project

MEXICO · PV GUANAJUATO

· Power: 60 MW nominal (73.3 MW peak)

· Total area used: 252 Ha

· Modules: 209,612 modules 350Wp

· Power Conditioner system: 13 inverters 5.1 MVA nad 2 inverters 2.55 MVA

· Solar Trackers: 3,614 single axis horizontal trackers

PV Guanajuato Project

MEXICO · PV XOXOCOTLA

· Power: 50 MW (56,632,400 PV peak).

· Modules: 182,960 solar modules of 315 PV.

· Approximate production: 120,000,000 kwh/year.

· Jobs created (construction phase): 700 jobs during the 12 months of construction.

· Jobs created (operation phase): 60 jobs for maintenance tasks.

PV Xoxocotla Project